Service 12 / Compliance

Permit Application Support

Drawings, documentation and council liaison for billboard and signage approvals, prepared to what each municipal corporation actually asks for.

Get help applyingSee locations

14Parishes, 14 processes
MonthsTypical approval window
0Structures built before approval
End to endSubmission handled
What it is

There is no national billboard authority in Jamaica

Outdoor advertising is regulated locally. The municipal corporation for the parish where the structure stands is the primary approving body, and the practical experience of applying differs from one to the next. An approval in St Andrew tells you very little about how St Ann will handle the same application.

That local variation is why applications fail. Drawings prepared to one council’s expectations get returned by another, and each round trip adds weeks. Our parish compliance map sets out the landscape, and our permit application guide walks through the paperwork.

We prepare and submit applications on behalf of clients through our municipal applications service, and there is a council application form to start from.

Included

What we prepare

The documentation councils assess, in the form they expect to receive it.

Structural drawings

Engineering drawings with wind loading calculations, which is the element councils scrutinise most closely.

Site plans

Position, setbacks and relationship to the carriageway, junctions and neighbouring property.

Sightline evidence

Demonstrating the structure does not obstruct visibility at junctions, bends or crossings.

Land consent

Proof of ownership or written consent from the landowner, current rather than inherited from a previous owner.

Illumination detail

Brightness and operating hours where lighting or LED is proposed, particularly near residential property.

Submission and liaison

Filed with the corporation and followed through, including responses to queries.

How it works

How an application proceeds

Confirm the authority

Which corporation, and whether roadway or planning bodies also have a say. This depends on where the site sits.

Establish current requirements

Requirements and fees change. We confirm before drawings are commissioned, because designing to a superseded standard is a wasted cycle.

Prepare documentation

Drawings, calculations, site plans and consent assembled as one package.

Submit and track

Filed and followed up. Queries answered promptly, since an unanswered query is the most common cause of delay.

Approval to build

Only once permission is in place does fabrication begin.

Detail

What councils assess

Assessment What it covers Why it matters here
Structural safety Foundations, frame, wind loading Hurricane exposure makes this the priority
Road safety Sightlines at junctions and bends Obstruction is a common refusal ground
Land rights Ownership or written consent Consent from a former owner may not carry
Visual amenity Scale and placement in context Applied tightly in heritage and tourism areas
Illumination Brightness and hours Scrutinised near residential property
Questions

Frequently asked

Do I need permission on my own land?

Yes. Private ownership does not remove the need for approval, and assuming otherwise is the most common breach we see.

How long does approval take?

Months, and it varies by parish and by how complete the submission is. Build the timeline around approval rather than the other way round.

What if I already built it?

Engage early rather than waiting for a notice. See what happens if your sign is non-compliant for the enforcement sequence and how to respond.

Do I need this to advertise on an existing board?

No. Compliance for an approved site sits with the site owner. This only applies to new structures.

Get the application right first time

Tell us where the site is and we will confirm which authority applies and what they will need.

Start a campaignOr call 1876-973-6923 · [email protected]